One of the important points in the installation of Izogam is the conditions of the building itself, which we will describe below. If Izogam is installed in the right season and on time, not only will it last longer, but it will also suffer less damage.

✅ The most suitable season for installing Izogam
Summer is the best and most suitable season for installing and implementing Izogam, because of the hot and dry weather that exists in the summer season. , the moisture caused by the rains dries up and eventually causes the adhesion of the isogam surface to the roof. Although this seems simple, its great advantage is that it prevents premature removal of the isogam from the roof. he does. Also, the beginning of the autumn season is also a good time for isogam work. Or the surface of the roof is wet and damp, try to implement isogam, you will not get a satisfactory result. Because if the surface of the roof is wet and humid, this will cause the isogam not to adhere well to the roof surface.
When the isogam does not adhere well to the roof surface, a gap is created between the isogam layers and the moisture The internal surface of the isogam penetrates, as a result, it causes dampness of the roof and the interior of the building.

What month of the year is suitable for the implementation of Izogam?
For the installation and implementation of Izogam, the best months in which Izogam can be done and have a satisfactory and quality result , the seasons are August, Shahrivar and Mehr. Because in the months of August and September, the air temperature is high and the roof is dry enough, which makes Izogam stick better on the roof. There was no rainfall in other seasons of the year, can Izogam work? In response to this question, it should be said that although the dryness of the roof surface is important, the coldness of the air also affects the quality of this work. The roof alone is not enough and the air temperature should also be taken into account so that it is suitable for the installation and implementation of Izogam, and usually this temperature should be between 10 and 40 degrees Celsius.
:
The construction on the roof is not finished yet.
The roof is not completely dry yet. be destroyed.
On the surface of the roof, there are objects such as air conditioner condensers or miscellaneous devices that should be removed from the roof as much as possible.
And...
< /p>

✅ Why does the humidity of the working surface cause the isolation of the isogham?
The remaining moisture on the roof surface causes, until the air temperature rises, the humidity under the isogham evaporates and the air penetrates under the isogam and eventually this causes the isogam to lose its adhesion over time and separate from the ceiling. Can it be installed on a surface that has already been asphalted or bitumen? There is no problem when it does not cause the roof to be heavy, otherwise you must remove the isogam or bitumen that is already on the surface of the roof and then install the isogam.